A transparent worksheet that separates rated power, measured demand, energy and total operating cost.

Direct answer. Calculate line electricity cost from measured demand, not nameplate power alone: measured kW × operating hours × local tariff. Then divide total kWh by accepted output to obtain energy per 1,000 pieces. Add labor, cleaning, compressed air, consumables and wear parts separately; label any unmeasured example as illustrative.

Utilities: what is verified and what must be measured

UtilityHow to use itStatus
Installed/nameplate powerElectrical design input; do not report it as kWh/hVerified per model page
Actual demand and energyMeasure during a defined FAT recipe and stable intervalBuyer/test team must measure
Voltage/frequencyConfirm ordered configuration and destination supplyConfiguration dependent
Compressed-air pressure0.6-0.8 MPa on published complete-line modelsVerified pressure; consumption unverified
Water and drainageDerive from approved cleaning procedure and local rulesBuyer must confirm
Ambient range / IP ratingDo not assume tropical rating or IP65/IP66No verified public value

Calculation framework

Estimated demand: nameplate kW × observed load factor. Energy: measured kW × hours. Electricity cost: kWh × tariff. Energy per 1,000 accepted pieces: total kWh ÷ accepted pieces × 1,000.

Illustrative calculation only: insert your own measured kW, hours, tariff and accepted output. This page does not present a SHENGXING measured energy result.

Test-condition worksheet

InputValue to recordUnit / evidence
Machine and configuration_____Model/configuration sheet
Nameplate power_____kW
Measured demand_____kW, calibrated meter
Run time_____hours
Accepted output_____pieces
Tariff_____currency/kWh
Labor and cleaning_____people, hours, water
Wear parts_____period and cost
Ambient / raw material_____conditions and batch
Meter uncertainty_____±%

Do not mix these terms

  • Nameplate power: installed or rated load, not an hourly energy result.
  • Measured demand: instantaneous or averaged real power during a defined test.
  • Energy consumption per hour: kWh consumed in one operating hour.
  • Energy per 1,000 pieces: kWh normalized by accepted output.

Frequently asked questions

Is nameplate kW the same as hourly consumption?

No. Use measured demand over a defined operating period.

Can I compare energy per piece between tests?

Only when product, accepted-output definition, run duration and conditions are comparable.

Does this page publish a measured saving claim?

No. It provides an illustrative calculation framework until approved test records are supplied.

What should a formal test record include?

Machine configuration, raw material, output, run time, ambient conditions, calibrated meter and uncertainty.

Request an engineering configuration

Send product size, target sustained capacity, filling, voltage, country and available line space.

REQUEST A CONFIGURATION